The Zapolyarnoye – Urengoy natural gas pipeline complex
Specifications
The pipeline is 590 km long with a pipe diameter of 1420 mm, the total annual design capacity - 100 million cubic metres of natural gas.
Maintained by Gazprom Transgaz Surgut and Gazprom Transgaz Yugorsk.
Major Repairs
The Komsomolsk - Surgut – Chelyabinsk pipeline, one line, a pipe diameter of 1420 mm (the following sections underwent repairs:
700 km – 728 km, 897 km – 929 km, 1001 km - 1025.7 km, 1194 km - 1236 km).
Completed major repairs projects
The Komsomolsk - Surgut – Chelyabinsk pipeline, a pipe diameter of 1420 mm (sections: 1298 km -1309 km, 1440 km - 1470.3 km).